Monday, December 29, 2014

NEW NUCLEAR REACTOR CONSTRUCTION IN THE US BEGAN AGAIN IN 2008 WITH LICENSING REQUEST UNDER THE POTUS GWB AND ONLY 5 NUCLEAR REACTOR HAVE BEEN APPROVED OF WHICH UNDER THE DEMOCRATS CONTROLLED NRC– IT SEEMS 40 ARE BEING CONSIDERED AND 26 PROPOSED BACK IN 2008 FOR CONTRUCTION BUT ONLY 5 HAVE GOTTEN FULL LICENSING APPROVAL AND UNDER CONSTRUCTION SINCE 2008–NOW UNDER THE POTUS DEMOCRAT BHO ENERGY HAS BUT STALLED AFTER 6 YEARS IN OFFICE WITH NOTHING TO SHOW FOR WITH ONLY 5 REACTORS APPROVED OF THE 26 PROPOSED BACK IN 2008 –THE MULTIPLE FAILURES OF THIS DEMOCRAT IS ASTOUNDING–AND NOT ONE NEW NUCLEAR REACTOR REQUEST FROM THE ENERGY STARVED STATE OF CALIFORNIA–THE LARGEST BASTION OF DEMOCRATS WITH NO VISION OF THEIR FUTURE

image

http://www.nei.org/Knowledge-Center/Nuclear-Statistics/US-Nuclear-Power-Plants/New-Nuclear-Plant-Status

The NRC voted in February 2012 to grant a combined construction and operating license for two reactors at Southern Co. subsidiary Georgia Power’s Plant Vogtle, near Waynesboro. It is the first combined license ever approved for a U.S. nuclear energy facility, which will become the nation’s first new nuclear units built in 30 years.  One month later on March 30, 2012, the NRC issued combined construction and operating licenses to South Carolina Electric & Gas Company for two reactors near Jenkinsville, South Carolina.

There are now five new nuclear plants under construction in the United States (Watts Bar 2, Summer 2, Summer 3, Vogtle 3, Vogtle 4). The NRC is actively reviewing eight combined license applications from six companies and consortia for 12 new nuclear power plants.

http://www.nei.org/Issues-Policy/New-Nuclear-Energy-Facilities/Building-New-Nuclear-Facilities

No comments:

Post a Comment